1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
Loading...Loading...
logo_Tractebel

The interconnection project of the ash extraction system in the Jorge Lacerda Coal-Fired Power Plant resulted in a 95% reduction in water consumption at the three Plant Units. Through an innovative system, Tractebel Energia has drastically reduced the volume of water collected from the Tubarão River for the extraction of wet ash.

All Details

Commitments

  • No commitments