This year CAEM completed the construction of the West Metepec interceptor, a facility of 1.52 cm wide Ø 4500 linear metres pipe, from the intersection of H. Enriquez Street and the Jaras Canal to the mines area of San Miguel Totocuitlapilco. This project was divided into three stages: the first with a diversion structure to divert storm water into the interceptor, controlling waste and other solids from entering; the second with the interceptor already in use; and thirdly, a buffer structure, a regulating reservoir and a structure that allows for the maximum rainwater use.