The final aim of the project is to cover the island’s consumption needs with energy from renewable sources. To do so, a wind farm and hydraulic plant. This is due to the fact that, in order to elevate the water from the island’s aquifer, conventional energy will not be needed any more, as well as because the island will have three desalinisation plants.

The system will be made up of two water deposits, a wind farm, a hydroelectrical plant, a pumping plant and a diesel engine plant (existing). The operation’s philosophy is based on supplying the electrical demand of the island with renewable sources, thus guaranteeing the stability of the electrical network; the diesel engine plant will only operate in exceptional/emergency cases, when there is not enough wind or water to produce the demanded energy.